Cup-Lock scaffolding, which is used as a high load bearing system under the floor and beam formwork, is also a system that can be used as an exterior scaffolding. It is especially used as a formwork carrier scaffolding. The system consists of vertical elements consisting of lower bowls and cups and horizontal. Vertical elements Ø 48×3 mm, horizontal elements Ø 48×2.5 mm are manufactured from TSE certified pipes. Installation and disassembly is very easy. There is no risk of loss as it is on the pieces. It has ease of height adjustment with its lower and upper adjustment shafts. Horizontal elements with welded pieces pass into the cups found in the vertical elements. Installation is provided with hammer blows and high load carrying is ensured with confidence.

SYSTEM FEATURES

  • Bottom bowl and cup connections located at 50 cm or 100 cm intervals on vertical elements increase the carrying capacity of the scaffolding strut.
  • Up to 4 horizontal connections can be made in all directions at the connection point on the uprights.
  • Easily installed and disassembled with a single hammer blow. It is very advantageous in terms of time and labor since no fastener is used.
  • It can be used safely at the desired height and width.
  • Walking platforms are produced with holes to prevent slipping and falling.
  • Elements are produced automatically and in series in gas metal arc welding robots.
  • Its durability is quite high.